Case Studies

These three case studies represent the majority of the design and manufacture work carried out by Crosstech Engineering.

Irrigation Pumping Installation
A completed project on the Ashburton – Lyndhurst irrigation scheme. Total output of 240kW powering both high and low pressure pumps. Providing irrigation for 5 farms.

Combined Electricity and Pumping Installation
An installation on the Mayfield – Hinds irrigation scheme. This turbine pumps up to 180L/s and up to 190kW of power generation.

Pelton Wheel for Stock Water Supply
Installed in a remote location, several kilometers from nearest electricity supply. This pelton wheel drives a high head multi stage centrifugal pump for stock water supply in Southland.