Combined Electricity and Pumping Installation

• Installed on Mayfield Hinds Irrigation Scheme in Mid Canterbury. • Turbine drives two irrigation pumps delivering 180 L/sec plus up to 190 kW generated back into national grid. • Turbine maximum flowrate of 4.2 m3/sec with operating head 7.2 m. • Takes … Continue reading Combined Electricity and Pumping Installation