Case Studies

These three case studies represent the majority of the design and manufacture work carried out by Crosstech Engineering. Irrigation Pumping Installation A completed project on the Ashburton – Lyndhurst irrigation scheme. Total output of 240kW powering both high and low … Continue reading Case Studies